Build your home in Bangalore, your way

Premium construction packages within budgets at Jackfruithomz

Our company offers innovative solutions to overcome the increase in house construction costs in Bangalore, enabling you to build your dream home with ease. Unmatched quality and superior design - when it comes to construction packages offered by Jackfruithomz, you can be assured to have it all. Our bouquet of extensive services are carefully curated so as to give our customers an optimized output. At Jackfruithomz, we believe in delivering premium construction services to our clients. Our house construction packages are crafted with extensive amenities. While our pricing may appear premium, our trusted experts provide top-notch services that ensure no compromise on quality and finishing. Browse our packages to get an estimate that suits your needs and requirements.₹

₹1995, per sqft Package

  • 2D Floor Plans (Up to 5 revisions)
  • Visual site survey & drawings on the basis of measurement provided by client
  • Soil Test report
  • 3D Elevation Design (Up to 3 Options)
  • Structural Design & Drawings as per IS Code
  • Visualize your floor plans with the help of curated VR models of your home, and get a better understanding on the room sizes.
  • Working Drawings
  • MEP Design & Drawings
  • Aggregates - 12 mm , 20mm & 40mm
  • Blocks - standard solid concrete blocks. 6” for exterior walls & 4” for interior walls.
  • M sand for blockwork & P sand for plastering
  • RCC Design in M-25 grade concrete.
  • The plinth level will be provided at a height of 1’6” above the existing ground level. PCC of 100mm shall be provided at the plinth level below the ground floor flooring.
  • Chicken mesh shall be used near beam, column and masonry wall junction.
  • Ceiling Height – 10’ (Finished Floor level to Finished Floor level)
  • 3KGs of steel and 0.4 bags of cement will be used to construct every square feet of the building.
  • Steel – TMT bar Fe550 – Brand of client’s choice
  • Cement – 43 & 53 Grade – OPC – Brand of client’s choice
  • One kitchen of upto 100 Sqft Construction area will be provided for every 2,000 Sqft of build-up area. Additional or larger kitchens will be charged extra.
  • Kitchen Counter (Interior Scope)
  • Ceramic Wall Tiles (Interior Scope)
  • Main Sink Inlet & Outlet Povision
  • Kitchen Sink (Interior Scope)
  • Provision shall be made for water purification inlet near kitchen sink.
  • Provision shall be made for washing machine inlet and outlet for utility/dry balcony.
  • Utility area shall be provided with a water inlet and outlet Provision.
  • Provision for chimney shall be provided.
  • One washroom of 40 Sqft is included in the package per 1,000 Sqft of package built-up area. Additional washrooms shall be charged on pro-rata basis.
  • Bathroom flooring - anti-skid tiles of value upto ₹60/Sqft Up to 2 X 2 tile.
  • Bathroom Ceramic Wall Tiles with 7’ height - Upto ₹60/Sqft Up to 2 X 2 tile.
  • Sanitary ware & CP Fittings - upto ₹40,000 are included per bathroom. Additional sanitary ware and CP fittings will be charged on a pro-rata basis. One number Floor Mounted EWC, health faucet, wash basin & cock, overhead shower with 2 in 1 wall mixer of Jaguar make is included.
  • CPVC Pipe - Ashirwad / Supreme or equivalent.
  • Bathroom doors - WPC Vascal & doors
  • External pipes shall be fixed on raised clamps.
  • Provision for exhaust fan shall be provided.
  • The total area of opening for windows & ventilators including frame has to be within 10% of the built up area. In case of increase, an additional charge will be applicable.
  • The total area of opening for doors including frame has to be within 10% of the built up area. In case of increase, an additional charge will be applicable.
  • 1 main door shall be provided per project. The main door shall be 36mm thick of Size 3'6"x7' of - upto ₹50,000 including frame in African teak wood or equivalent. The frame thickness will be 3"x5". The main door price includes 2 brass coated tower bolts, 3 brass coated hinges, lock of upto ₹2,000 of Europa or equivalent make and 1 door stopper.
    African teak Frame:17,000/-
    African teak Door:17,000/-
    Polishing & Hardware & fixing : 16,000/-
  • The main door will be of above specification for residences (Duplex) only. For rental (multiple) units, membrane/flush doors will be provided.
  • Internal doors shall be 32mm thick membrane/flush doors of Size 3'x7' of upto ₹10,000 including frame in sal wood. The frame thickness will be 3"x4". The price includes 2 numbers MS/aluminium tower bolts, 3 MS hinges and 1 door stopper.
    Sal wood Frame:3,400/-
    membrane Door:3,400/-
    Frame Painting & Hardware & fixing : 3,200/-
  • Bathroom doors shall be 32mm thick WPC doors of size 2'6"x7' of upto ₹7,000 including frame in WPC. The frame thickness will be 2.5"x3". The price includes 2 numbers MS/aluminum tower bolts, 3 MS hinges.
    WPC Frame:2,400/-
    WPC Door:2,400/-
    Frame Painting & Hardware & fixing : 2,200/-
  • Europa Cylindrical locks will be provided for all internal doors.
  • Windows – UPVC windows with glass and mesh shutters (2.5 track with 1 mesh) worth ₹500 per Sqft including the frames and fixtures.
  • Window grills of upto ₹150 per Sqft of Normal MS rod with thickness of 10mm with spacing of 100mm shall be provided.
  • Window Chajja top is provided as part of the package – Upto 1’ outward projection and 6” bearing on each side of window
  • The exteriors will be painted with one coat Asian primer and two coats of Apex exterior emulsion paint or equivalent.
  • The interior walls and ceiling shall be painted with 2 coats putty, 1 coat of primer and 2 coats Asian Paints Tractor emulsion or equivalent.
  • The choice of colours is restricted to upto 2 in a room and upto 6 overall. Any additional colours will be chargeable.
  • All MS grills and railings shall be painted with an anti-corrosion coat with a final coat of enamel paint.
  • Staircase MS Railing without glass.
  • All Balcony railing: MS Railing without glass upto 30 Rft.
  • Living & dining – 2’x4’ tiles of value upto ₹90/Sqft
  • Rooms & kitchen – 2’x2’ tiles of value upto ₹70/Sqft
  • Balcony & open areas – anti-skid tiles of value upto ₹50/Sqft
  • Staircase Flooring - Sadarahalli Granite of value upto ₹100/Sqft
  • Parking – anti-skid tiles of value upto ₹50/Sqft including laying.
  • All Wet areas flooring Shall be Done with Epoxy Grouting.
  • All Dry areas flooring Shall be Done with polymeric cement grout.
  • Flooring/dado/skirting must to level/to plumb.
  • Skirting shall be of tiles.The height of skirting shall not be less than 75mm.
  • Labor charges for cutting, laying, polishing, nosing, chamfering of granite shall be extra.
  • Labor charges for laying of tiles bigger than the standards shall be extra.
  • Bathroom shall be provided with 2 light point, 1 geyser point, 1, 5amp plug For Exhaust fan.
  • Rooms shall be provided with 3 light points, 1 fan point, 2 5amp plug points near bedside or TV/study/dresser & 1 16amp switch & socket for AC.
  • Living/Dining/Family Room shall be provided with 2 fan points, 4 light points, 3 5amp switch and sockets and 1 TV cable point
  • Kitchen shall be provided with 2 light points; 4 15amp plug points for refrigerator, mixer, oven & water purifier.
  • 1 light point each shall be provided with a two-way switch connection for each room, living room and staircase.
  • Each house shall be provided with 1 calling bell provision.
  • Corridor/passage/portico/parking/utility/terrace/external stairs/balcony/space around house/ any other built up area shall be provided with 5 light points and 5 5amp switches and sockets at suitable locations per project.
  • All wiring shall be done with wires of anchor/great white or equivalent make.
  • All switches and sockets shall be provided of anchor roma/great white make or equivalent
  • Wiring for UPS if required shall be charged additional.
  • One MCB board of anchor/great white or equivalent make shall be provided.
  • One earthing pit shall be provided per project.
  • Main panel board shall be in the owner's scope including road cutting charges and main-line from pole to panel board.
  • Overhead Tank – 1 Sintex Double Layered 1,500 liters.
  • An underground sump of 6,000 liters shall be provided .The sump will be constructed with concrete block masonry. PCC bed concrete of minimum 100mm thickness shall be provided at the base. The inside of the wall shall be provided with chicken mesh plastering. MS cover plate of dimension 600 mm x 600 mm shall be provided. Water Proofing chemical be applied to mortar for plastering.
  • Staircase Railing will be in MS with simple pattern finished with enamel Paint upto ₹250/rft.
  • Weather proof course shall be provided at terrace with one coat of waterproofing agent of Dr. Fixit brand or equivalent.
  • 2nos 6” rainwater discharge pipes shall be provided. Rain water harvesting will be charged extra.
  • Elevation of the building on all sides shall include basic plastering and external painting with no cladding/ grooves/ cuts/ projections or any other pure aesthetic elements.
  • Parapet wall shall be provided with height of 3’ and 100mm thick. Buttress shall be provided at every 3 m (10’) of length.
  • Sewer line connection to the main drain line is included in the package up to 10 feet from the building.
  • Basic cost considered for cement is ₹350/bag and steel are ₹55,000/MT. The differential cost shall be charged on actuals on agreement signature.
  • The foundation has been assumed as isolated footings in regular 180kN/m^2 of SBC and above and up to a depth of 5 feet.
  • Quantity of steel & cement (as recommended by structural engineer and external consultant) over and above the default quantity usage will be charged extra as per brands chosen and applicable rate on the day of signing of the agreement.
  • Main gate & post is not included in package.
  • Compound wall is not included in package.
  • Puja room door/window/vent/slab if applicable shall be charged additional.
  • For soil conditions requiring specialized foundation design or/and additional depth of excavation over and above 5 feet, additional charge for every foot of increment will be applicable. This is apart from the extra steel & concrete requirement.
  • Transportation of excavated earth is included only Adjacent sides from the construction site. Backfilling shall be done using excavated soil only. Backfilling using burrowed earth shall be charged for material and transportation.
  • In case of rocky terrains, excavation costs shall be charged extra for foundation, sump, soak pit and other excavation items.
  • In case the site level is more than 6" below the road level, additional filling charges will be applicable.
  • For constrained sites where excavated soil cannot be stored and needs to be carted out to make way for construction, soil for refilling shall be charged additional.
  • Plinth protection (SSM) will be charged extra.
  • In case of external staircase, headroom will be charged at par with package built-up area.
  • A Septic tank in blockwork & For RCC septic tank additional Charges shall be applicable.
  • Lofts inside rooms and kitchen will be charged extra.
  • Basement and retailing wall will be extra.
  • For raising finished Floor Level in ground floor beyond 1.5’ from the existing ground level will be extra.
  • Italian/Indian marble/ Granite laying, buffing chamfering, nosing & chemical treatment cost will be extra.
  • Excavation will be charged extra when encountered with water/loose soil/stone.
  • Footings and column provision for additional floor will be charged extra.
  • Slab thickness more than 5” will be charged extra.
  • A service charge of 10% will be applicable for fixing/installing the items provided by the client.
  • The lintels throughout the house other than the door and window opening will be charged extra.
  • Rain water harvesting will be provided as per BBMP norms at nominal cost.
  • Barricading the site during construction in simple shade net is included. Additional charges shall apply for any other kind of barricading
  • Platform for overhead tank is not included in the standard package and shall be charged based on the area and materials selected.
  • Anti-termite treatment is additional and may be provided at an extra charge.
  • Elevations with materials like CNC cutting jalli/ RCC pergolas/ MS pergolas etc will be charged extra.
  • Pile foundation/ SSM/ Eccentric footing/retaining wall will be additional as per structural drawings.
  • Dewatering during excavation/backfilling if required shall be charged as per actuals.
  • Extra Reinforcement will be charged additional unless advised in the drawings.
  • Lift concrete wall will be additionally charged.
  • A specific area to construct labour and material shed needs to be provided within 50’ from the construction site by the client.
  • All designed elements of the structure, elevation, compound wall & main gate has to be part of the final agreement and has to be executed by Jackfruithomz.
  • This is a Specification and not a Contract. This will be converted into a contract once the customer starts off the project with Jackfruithomz.
  • We provide 3 years’ warranty of structural elements in reinforced cement concrete (RCC) from the date of Handover of the Project. For all other civil works, a warranty of 1 Year from the date of handover shall be provided. This warranty in total shall be limited to 1% of the project value and will cover defects that arise from workmanship and shall exclude defects arising due to natural wear and tear, poor maintenance, forces of nature, acts of God, improper usage and any other factor/load/impact for which the structure is not designed. Such warranty shall not cover anything which was not part of the Contract and the scope of work defined therein.
  • Any item, activity or specification not mentioned in the package is additional. The charges will be calculated as RA at the time of agreement or execution.
  • Electricity and water charges during the construction, Plan sanction, BESCOM, BWSSB and all other approval cost will be client’s scope.
  • No reduction or refund will be made if raw materials are downgraded or not taken by the client.
  • The quotation value will change if the customer adds/updates any specification.
  • All plumbing and electrical work will be done as per the drawing given by the Architect.
  • In case of delay in payment by the customer; a monthly interest of 3% (pro-rata) will be charged on the amount that is delayed. Also, 2 days will be added to the final date of delivery for every day of delay in payment.
  • Quote is prepared based on optimal structural designs based on all relevant IS codes for construction. Customized designs may levy an additional fee.
  • The construction will be carried out as per the specifications, dimensions and quantities as mentioned in this quotation. Differential charges will be applicable for any change in specifications, dimensions or quantities as per the actual calculations and rates mutually agreed between and with the written consent of Customer and Jackfruithomz.
  • The MA/Contract is exempt from any lockdown like scenario and any other reason under the purview of force majeure.
  • All payments made at each stage are Non-Refundable. (except token)
  • The colours in the images shown in 3D may not match to accuracy in original.
  • Fixing & installation charges of appliances purchased from us will be extra and on actuals.
  • We reserve the right to shoot, take photographs of the work done and showcase the same in various social media/other platform as part of completed project.
  • The Project shall be deemed delivered if complete structures are erected with required fittings and accessories.
  • All legal matters are subject to the courts in Bangalore only.
Delay Period Compensation
60-90 Days 0.25% of project value
90-180 Days 0.5% of project value
>180 Days 1% of project value

₹2395, per sqft Package

  • 2D Floor Plans (Up to 5 revisions)
  • Visual site survey & drawings on the basis of measurement provided by client
  • Soil Test report
  • 3D Elevation Design (Up to 3 Options)
  • Structural Design & Drawings as per IS Code
  • Visualize your floor plans with the help of curated VR models of your home, and get a better understanding on the room sizes.
  • Working Drawings
  • MEP Design & Drawings
  • Aggregates - 12 mm , 20mm & 40mm
  • Blocks - standard solid concrete blocks. 6” for exterior walls & 4” for interior walls.(apco/Shoba blocks)
  • M sand for blockwork & P sand for plastering.
  • RCC Design in M-25 grade concrete.
  • The plinth level will be provided at a height of 1’6” above the existing ground level. PCC of 100mm shall be provided at the plinth level below the ground floor flooring.
  • Chicken mesh shall be used near beam, column and masonry wall junction.
  • Ceiling Height – 11’ (Finished Floor level to Finished Floor level)
  • 3KGs of steel and 0.4 bags of cement will be used to construct every square feet of the building.
  • Steel – TMT bar Fe550 – Brand of client’s choice
  • Cement – 43 & 53 Grade – OPC – Brand of client’s choice
  • One kitchen will be provided At Any Size.
  • Kitchen Counter (Interior Scope)
  • Ceramic Wall Tiles (Interior Scope)
  • Main Sink Inlet & Outlet Provision.
  • Kitchen Sink (Interior Scope)
  • Provision shall be made for water purification inlet near kitchen sink.(Hot and Cold)
  • Provision shall be made for washing machine/Dryer inlet and outlet for utility/dry balcony.
  • Utility area shall be provided with a water inlet and outlet Provision.
  • Provision for Hob & chimney shall be provided.
  • One washroom of 45 Sqft is included in the package per 1,000 Sqft of package built-up area. Additional washrooms shall be charged on pro-rata basis.
  • Bathroom flooring - anti-skid tiles of value upto ₹80/Sqft Up to 2x2 tile.
  • Bathroom Ceramic Wall Tiles with 7’ height - Upto ₹80/Sqft Up to 2 X 4 tile.
  • Sanitary ware & CP Fittings - upto ₹70,000 are included per bathroom. Additional sanitary ware and CP fittings will be charged on a pro-rata basis. One number Concealed EWC, health faucet, wash basin & cock, overhead shower with 2 in 1 wall mixer (Diverter model of Jaguar/Kohlar make is included.
  • CPVC Pipe - Ashirwad / Supreme or equivalent.
  • Bathroom doors - WPC Vascal & doors
  • External pipes shall be fixed on raised clamps.
  • Provision for exhaust fan shall be provided.
  • The total area of opening for windows & ventilators including frame has to be within 12% of the built up area. In case of increase, an additional charge will be applicable.
  • The total area of opening for doors including frame has to be within 12% of the built up area. In case of increase, an additional charge will be applicable.
  • 1 main door shall be provided per project. The main door shall be 40mm thick of Size 3'6"x7' of - upto ₹1,00,000 including frame in Boder teak wood or equivalent. The frame thickness will be 3"x5". The main door price includes 2 brass coated tower bolts, 4 brass coated hinges, Finger print lock of upto ₹12,000 of Europa or equivalent make and 1 door stopper.
    Border teak Frame:33,000/-
    Border teak Door:33,000/-
    Polishing & Hardware & fixing : 34,000/-
  • The main door will be of above specification for residences (Duplex) only. For rental (multiple) units, membrane/flush doors will be provided.
  • Internal doors shall be 32mm thick Laminated doors of Size 3'x7' of upto ₹16,000 including frame in sal wood. The frame thickness will be 3"x4". The price includes 2 numbers SS tower bolts, 3 SS hinges and 1 door stopper.
    Sal wood Frame: 4,500/-
    Laminated Door:6,500/-
    Frame painting & Hardware & fixing : 5,000/-
  • Bathroom doors shall be 32mm thick WPC doors of size 2'6"x7' of upto ₹10,000 including frame in WPC. The frame thickness will be 3"x3". The price includes 2 numbers SS/aluminum tower bolts, 3 SS hinges.
    WPC Frame: 3,400/-
    WPC Door: 3,400/-
    Frame painting & Hardware & fixing : 3,200/-
  • Europa Cylindrical locks will be provided for all internal doors.
  • Windows – UPVC windows with glass and mesh shutters (2.5 track with 1 mesh) worth ₹500 per Sq Ft including the frames and fixtures. (Frame Thickness 92MM)
  • Window grills of upto ₹170 per Sqft of MS bright rod with thickness of 10mm with spacing of 100 mm shall be provided.
  • Window Chajja top is provided as part of the package – Upto 1’ outward projection and 6” bearing on each side of window.
  • The exteriors will be painted with one coat Asian primer and two coats of Apex Ultima exterior emulsion paint or equivalent.
  • The interior walls and ceiling shall be painted with 2 coats putty, 1 coat of primer and 2 coats Asian Paints premium emulsion or equivalent.
  • The choice of colours is restricted to upto 3 in a room and upto 8 overall. Any additional colours will be chargeable.
  • All MS grills shall be painted with an anti-corrosion coat with a final coat of enamel paint.
  • Staircase SS Railing without glass.
  • All Balcony railing: SS Railing with glass upto 30 Rft.
  • Living & dining – tiles of value upto ₹150/Sqft (Any Size)
  • Rooms & kitchen – 2’x4’ tiles of value upto ₹100/Sqft
  • Balcony & open areas – anti-skid tiles of value upto ₹65/Sqft
  • Staircase Flooring - Sadarahalli Granite (or) Black Granite of value upto ₹150/Sqft
  • Parking – anti-skid tiles of value upto ₹70/Sqft.
  • All Wet & dry areas flooring Shall be Done with Epoxy Grouting.
  • Flooring/dado/skirting must to level/to plumb.
  • Skirting shall be of tiles.The height of skirting shall not be less than 75mm.
  • Labor charges for cutting, laying, polishing, nosing, chamfering of granite shall be extra.
  • Labor charges for laying of tiles bigger than the standards shall be extra.
  • Bathroom shall be provided with 3 light point, 1 geyser point, 2, 5amp plug For Exhaust fan.
  • Rooms shall be provided with 3 light points, 1 fan point, 4 5amp plug points near bedside or TV/study/dresser & 1 16amp switch & socket for AC.
  • Living/Dining/Family Room shall be provided with 2 fan points, 6 light points, 5 5amp switch and sockets and 1 TV cable point
  • Kitchen shall be provided with 3 light points; 6 15amp plug points for refrigerator, mixer, oven, microwave & water purifier.
  • 1 light point each shall be provided with a two-way switch connection for each room, living room and staircase.
  • Each house shall be provided with 1 calling bell provision.
  • Corridor/passage/portico/parking/utility/terrace/external stairs/balcony/space around house/ any other built up area shall be provided with 5 light points and 5 5amp switches and sockets at suitable locations per project.
  • All wiring shall be done with wires of anchor/great white/Havells or equivalent make.
  • All switches and sockets shall be provided of anchor roma/great white/Legrand/GM make or equivalent
  • Wiring for UPS if required shall be Provided.
  • One MCB board of anchor/great Legrand/GM white or equivalent make shall be provided.
  • One earthing pit shall be provided per project.
  • Main panel board shall be in the owner's scope including road cutting charges and main-line from pole to panel board.
  • Overhead Tank – 2 Sintex Double Layered 1000 liters each.
  • An underground sump of 6,000 liters shall be provided .The sump will be constructed with concrete RCC masonry. PCC bed concrete of minimum 100mm thickness shall be provided at the base. The inside of the wall shall be provided with chicken mesh plastering. MS cover plate of dimension 600 mm x 600 mm shall be provided. Water Proofing chemical be applied to mortar for plastering.
  • Weather proof course shall be provided at terrace with one coat of waterproofing agent of Dr. Fixit brand or equivalent.
  • 2nos 6” rainwater discharge pipes shall be provided. Rain water harvesting will be charged extra.
  • Elevation of the building on all sides shall include basic plastering and external painting with no cladding/ grooves/ cuts/ projections or any other pure aesthetic elements.
  • Parapet wall shall be provided with height of 3’ and 100mm thick. Buttress shall be provided at every 3 m (10’) of length.
  • Sewer line connection to the main drain line is included in the package up to 10 feet from the building.
  • Basic cost considered for cement is ₹400/bag and steel are ₹60,000/MT. The differential cost shall be charged on actuals on agreement signature.
  • The foundation has been assumed as isolated footings in regular 180kN/m^2 of SBC and above and up to a depth of 5 feet.
  • Quantity of steel & cement (as recommended by structural engineer and external consultant) over and above the default quantity usage will be charged extra as per brands chosen and applicable rate on the day of signing of the agreement.
  • Main gate & post is not included in package.
  • Compound wall is not included in package.
  • Puja room door/window/vent/slab if applicable shall be charged additional.
  • For soil conditions requiring specialized foundation design or/and additional depth of excavation over and above 5 feet, additional charge for every foot of increment will be applicable. This is apart from the extra steel & concrete requirement.
  • Transportation of excavated earth is included only Adjacent sides from the construction site. Backfilling shall be done using excavated soil only. Backfilling using burrowed earth shall be charged for material and transportation.
  • In case of rocky terrains, excavation costs shall be charged extra for foundation, sump, soak pit and other excavation items.
  • In case the site level is more than 6" below the road level, additional filling charges will be applicable.
  • For constrained sites where excavated soil cannot be stored and needs to be carted out to make way for construction, soil for refilling shall be charged additional.
  • Plinth protection (SSM) will be charged extra.
  • In case of external staircase, headroom will be charged at par with package built-up area.
  • A Septic tank in blockwork & For RCC septic tank additional Charges shall be applicable.
  • Lofts inside rooms and kitchen will be charged extra.
  • Basement and retailing wall will be extra.
  • For raising finished Floor Level in ground floor beyond 1.5’ from the existing ground level will be extra.
  • Italian/Indian marble/ Granite laying, buffing chamfering, nosing & chemical treatment cost will be extra.
  • Excavation will be charged extra when encountered with water/loose soil/stone.
  • Footings and column provision for additional floor will be charged extra.
  • Slab thickness more than 5” will be charged extra.
  • A service charge of 10% will be applicable for fixing/installing the items provided by the client.
  • The lintels throughout the house other than the door and window opening will be charged extra.
  • Rain water harvesting will be provided as per BBMP norms at nominal cost.
  • Barricading the site during construction in simple shade net is included. Additional charges shall apply for any other kind of barricading
  • Platform for overhead tank is not included in the standard package and shall be charged based on the area and materials selected.
  • Anti-termite treatment is additional and may be provided at an extra charge.
  • Elevations with materials like CNC cutting jalli/ RCC pergolas/ MS pergolas etc will be charged extra.
  • Pile foundation/ SSM/ Eccentric footing/retaining wall will be additional as per structural drawings.
  • Dewatering during excavation/backfilling if required shall be charged as per actuals.
  • Extra Reinforcement will be charged additional unless advised in the drawings.
  • Lift concrete wall will be additionally charged.
  • A specific area to construct labour and material shed needs to be provided within 50’ from the construction site by the client.
  • All designed elements of the structure, elevation, compound wall & main gate has to be part of the final agreement and has to be executed by Jackfruithomz.
  • This is a Specification and not a Contract. This will be converted into a contract once the customer starts off the project with Jackfruithomz.
  • We provide 3 years’ warranty of structural elements in reinforced cement concrete (RCC) from the date of Handover of the Project. For all other civil works, a warranty of 1 Year from the date of handover shall be provided. This warranty in total shall be limited to 1% of the project value and will cover defects that arise from workmanship and shall exclude defects arising due to natural wear and tear, poor maintenance, forces of nature, acts of God, improper usage and any other factor/load/impact for which the structure is not designed. Such warranty shall not cover anything which was not part of the Contract and the scope of work defined therein.
  • Any item, activity or specification not mentioned in the package is additional. The charges will be calculated as RA at the time of agreement or execution.
  • Electricity and water charges during the construction, Plan sanction, BESCOM, BWSSB and all other approval cost will be client’s scope.
  • No reduction or refund will be made if raw materials are downgraded or not taken by the client.
  • The quotation value will change if the customer adds/updates any specification.
  • All plumbing and electrical work will be done as per the drawing given by the Architect.
  • In case of delay in payment by the customer; a monthly interest of 3% (pro-rata) will be charged on the amount that is delayed. Also, 2 days will be added to the final date of delivery for every day of delay in payment.
  • Quote is prepared based on optimal structural designs based on all relevant IS codes for construction. Customized designs may levy an additional fee.
  • The construction will be carried out as per the specifications, dimensions and quantities as mentioned in this quotation. Differential charges will be applicable for any change in specifications, dimensions or quantities as per the actual calculations and rates mutually agreed between and with the written consent of Customer and Jackfruithomz.
  • The MA/Contract is exempt from any lockdown like scenario and any other reason under the purview of force majeure.
  • All payments made at each stage are Non-Refundable. (except token)
  • The colours in the images shown in 3D may not match to accuracy in original.
  • Fixing & installation charges of appliances purchased from us will be extra and on actuals.
  • We reserve the right to shoot, take photographs of the work done and showcase the same in various social media/other platform as part of completed project.
  • The Project shall be deemed delivered if complete structures are erected with required fittings and accessories.
  • All legal matters are subject to the courts in Bangalore only.
Delay Period Compensation
60-90 Days 0.25% of project value
90-180 Days 0.5% of project value
>180 Days 1% of project value